Our firm has also inspected 8 of the 9 Shoe Carnival stores located on the island. These projects that range frm $600,000 (8,000 square feet) to $1,200,000.00 (17,000 square feet) as shown on the left hand side slides.
We have decided to incorporate a few pages of our inspection reports to show our clients what to expect from one of our deliverables.
Note that issues documented in detailed reports show non compliance items that needed to be corrected as per the Contract Documents (Contract and Construction Drawings). Examples of issues noted are:
length and with of welds for steel members
seismic suspension systems for acoustical ceilings
stud spacing and anchorage
ac duct components
lighting and receptacle installation and components
quality of finishes (floor tile, wall tile, paint)
Fire protection compliance
Americans with Disabilities Act Guidelines Compliance
After the items are corrected, the list is updated to show that corrective action has been achieved.
The reports are sent on a weekly basis to the owner or as directed by the owner to keep the information up to date and have status reports regarding the work progress.
Permit Expediting was also provided for these projects. The documents coordinated and/ or provided were:
Construction Permit
Monthly inspection reports (OGPe requirements)
Fire Department Endorsement
Health Department Endorsement
Certificate of Occupancy
we set up the utilities accounts for the power and water.