$2,700,000.00
Road #2, Bo. Membrillo, Camuy
Although our Project Management and Inspection team has inspected over 40 Walgreens during the past 12 years, this Walgreens included a Commissioning requirement in the Specifications and Walgreens Criteria.
A commissioning report that included all of the tests performed to the equipment was prepared and delivered.
AC Roof Top Units
Lighting Controls
Fire Alarm
Fire Supression
Emergency Generator
Water Heater